Jubilee River

Coastal, waterways and wetlands

Design and construction a new river channel to take overflow from the River Thames and so alleviate flooding in and around the towns of Maidenhead, Windsor and Eton.

International Riverprize 2010; Royal Town Planning Institute Award for Planning Achievement 2002; Institution of Civil Engineers Award 2002

Environment Agency- Richard Copas, National Environmental Assessment Service |Consultant leads Chris Blandford Associates (Design) |Jacobs (Construction) |Environment Agency RPS Clouston

The Royal Borough of Windsor and Maidenhead and Slough Borough Council

Circa £100 million

Environment Agency

Seed was collected from local areas, germinated and grown on in Lincolnshire before being returned and planted on site making it one of the most well planned and managed local provenance planting schemes ever undertaken, including approximately 250,000 trees.

The scheme required the excavation of material from most of the 7 mile channel length. This material was reused to create two raised areas of land with panoramic views of the surrounding area including Windsor Castle. The raised areas are located in part on what was previously the sludge drying beds of Slough Sewage Treatment Works, This central location was used as a hub for the materials management in the scheme with the channel being excavated from each end towards the hub to avoid intensive use of the highways in the area. The channel and its margins in this area now form Dorney Wetlands, in a transformed landscape that is now a honeypot to people and wildlife.

jubilee river flood relief channel case study gcse

Approximate Map Location

Primrose Kitten

  • 2023 Predicted Papers
  • A-Level Biology
  • A-Level Chemistry
  • A-Level Maths
  • A-Level Psychology
  • GCSE Science
  • GCSE Further Maths (Level 2, Level 3, FSMQ)
  • GCSE History
  • GCSE Citizenship
  • GCSE Geography
  • Group Code Registration Form
  • Biology Reading List
  • Chemistry Reading List
  • The Ultimate guide to the EPQ
  • UCAS and University
  • How to help your child succeed in exams
  • How to succeed in homeschooling
  • Teacher Shop
  • Group Registration
  • Group Registration FAQs
  • Your Profile

GCSE Geography – Case study – The Jubilee River

Quiz summary.

0 of 10 Questions completed

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Quiz complete. Results are being recorded.

0 of 10 Questions answered correctly

Time has elapsed

You have reached 0 of 0 point(s), ( 0 )

Earned Point(s): 0 of 0 , ( 0 ) 0 Essay(s) Pending (Possible Point(s): 0 )

  • Not categorized 0%

1 . Question

What is the flood relief channel for the River Thames called?

  • Jubilee River.
  • London River.
  • Thames Bypass River.
  • London Bypass river.

2 . Question

What is the name of the longest man-made flood relief channel in the UK (on the River Thames near Maidenhead)?

  • Maidenhead relief.
  • Thames relief.
  • London relief.

3 . Question

How long is the longest man-made flood relief channel in the UK (on the River Thames near Maidenhead)?

4 . Question

Which Government Agency funded the Jubilee River?

  • Environmental Agency.
  • Home Office.
  • Department for Flood Relief.
  • Department for Rural Affairs.

5 . Question

How much, in 2002, did the Jubilee River cost?

  • £110 million.
  • £10 million.
  • £1 million.
  • £25.4 million.

6 . Question

How wide is the Jubilee River?

7 . Question

What is the UK’s biggest artificial flood relief channel?

  • Kielder Dam.
  • River Avon.
  • River Thames.

8 . Question

How many weirs or large dams does the Jubilee River have along its course?

9 . Question

What is the most expensive flood-relief scheme in the UK?

  • Stratford Olympic Park.
  • Edinburgh Relief River.

10 . Question

How many of the Jubilee River weirs are navigable by paddle craft?

  • Terms and Conditions
  • Privacy Policy

Privacy Overview

Username or Email Address

Remember Me

Logo of Primrose kitten, an online revision website for students

Registration confirmation will be emailed to you.

River Flooding ( Edexcel GCSE Geography: B (1GB0) )

Revision note.

Bridgette

Geography Lead

Risks from River Flooding

  • River floods are one of the most common natural hazards
  • The risk from river flooding around the world has increased over the past 50 years

flood-events

Graph showing the increase in flood events over time

  • Deforestation
  • Agriculture
  • Urbanisation
  • These all increase overland flow/run off and decrease the lag time
  • The result is that the river's capacity is more likely to be exceeded leading to a higher flood risk 
  • Climate change may lead to increased rainfall or frequency of storms which increases the discharge
  • River channel management upstream can increase discharge downstream for example straightening the channel will increase the speed the water moves downstream increasing the risk of the river capacity being exceeded

Impacts of increased flood risk

  • There are a range of possible impacts of flooding
  • These can be both social and environmental

Possible Impacts of Flooding 

Homes destroyed and damaged leading to homelessness Destruction of animal habitats
Damage to crops and agricultural land which increases the chances of food shortages and food price increase Loss of food supply for animals 
Death and injury Pollution of land due to pollutants such as sewage and diesel in the flood water
Damage and destruction of transport routes (road and rail) Death and injury of animals
Loss of jobs due to the damage and destruction of businesses Destruction of trees and other vegetation
Loss of clean water supply as contaminated water enters the supply  
Loss of electricity and gas when water gets into the supply  

Worked example

Explain one way in which human activity can increase the risk of river flooding.

  • Building on floodplains/urbanisation (1) which can reduce infiltration and/or puts more people/property at risk (1)
  • Deforestation (1) which reduces infiltration and so increases runoff making rivers ‘peakier’ (1)
  • River channel management preventing river flooding upstream (1) so making river discharge larger downstream thus increasing risk (1)
  • Climate change idea (1) increasing rainfall and/or making weather stormier increasing discharge (1)

Managing Flood Risk

  • The key cause of flooding is the amount and duration of precipitation this cannot be altered
  • There are a number of methods of managing floods and reducing the severity and/or impact
  • Hard engineering involves building structures or changing the river channel
  • Soft engineering works with natural processes of the river and surrounding environment
  • Soft engineering is increasingly popular 
  • Soft engineering is an example of mitigation where schemes aim to minimise damage rather than trying to prevent the flooding 

Cost and Benefits of Hard Engineering

Enables the amount of discharge downstream to be controlled

Expensive to build 

Can affect habitats downstream

Increase the capacity of the river 

Use natural materials which blend with the environment

May fail due to erosion or water overtopping 

Can be expensive 

Increase flood risk downstream

Increases river capacity as it removes sediment from the river bed

Needs to be carried out regularly

Increases flood risk downstream

Allow some water to flow out of the main channel reducing the discharge and protecting areas in the immediate area Can lead to flooding elsewhere

Low maintenance

Relatively low cost

Increases flood risk downstream

Block the view of the river

Costs and Benefits of Soft Engineering

This supports the river by restoring it back to its original regime: putting meanders back in, stabilising banks and connecting to flood plains It involves land use change that the local population may not want
Areas are left undeveloped so that the floodwaters can flow on to them. This reduces discharge within the river channel Reduces the land available for development and agriculture

Means that only certain land uses are allowed on the flood plain, reducing flood risk

Provides areas for leisure and recreation

Reduces the land for development and agriculture
Reduces discharge by increasing infiltration and interception Not possible in all areas
  • Leaving the stubble on the fields after the crop is harvested helps to stabilise the soil and increase infiltration
  • Contour ploughing which involves ploughing fields across the slope rather than up and down. This gives the water more time to infiltrate and stops the ploughed furrows becoming channels for water
  • Improved forecasting and flood warnings

You've read 0 of your 10 free revision notes

Get unlimited access.

to absolutely everything:

  • Downloadable PDFs
  • Unlimited Revision Notes
  • Topic Questions
  • Past Papers
  • Model Answers
  • Videos (Maths and Science)

Join the 100,000 + Students that ❤️ Save My Exams

the (exam) results speak for themselves:

Did this page help you?

Author: Bridgette

After graduating with a degree in Geography, Bridgette completed a PGCE over 25 years ago. She later gained an MA Learning, Technology and Education from the University of Nottingham focussing on online learning. At a time when the study of geography has never been more important, Bridgette is passionate about creating content which supports students in achieving their potential in geography and builds their confidence.

GoConqr Logo

  • Sign Up for Free Sign Up

Jubilee River - Case Study

Description.

Tom ..

over 6 years ago

Resource summary

Question Answer
Location Relief channel for River Thames in south-east England
Cost £330 million
Opened 2002
Weirs? 5
Reduces risk Maidenhead, Eton and Windsor
Why was it required Thames flood plain - low Protect Windsor Urbanisation caused flooding High property value Take overflow water
Issues - Social Some places have gained, less wealthy settlements have resulted in a higher flood risk
Issues - Economic Most expensive scheme, but after 1 year, weirs were damaged Small businesses will loose money
Issues - Environmental 2014 flooding downstream - fields were damaged and habitats disturbed Concrete weirs are ugly and algae collected behind them

Want to create your own Flashcards for free with GoConqr? Learn more .

Cookies on GOV.UK

We use some essential cookies to make this website work.

We’d like to set additional cookies to understand how you use GOV.UK, remember your settings and improve government services.

We also use cookies set by other sites to help us deliver content from their services.

You have accepted additional cookies. You can change your cookie settings at any time.

You have rejected additional cookies. You can change your cookie settings at any time.

  • Environment
  • River maintenance, flooding and coastal erosion

Jubilee River flood alleviation scheme

Environment Agency

Updated 29 September 2021

jubilee river flood relief channel case study gcse

© Crown copyright 2021

This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: [email protected] .

Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned.

This publication is available at https://www.gov.uk/government/publications/jubilee-river-flood-alleviation-scheme/jubilee-river-flood-alleviation-scheme

The Jubilee River was built by the Environment Agency and opened in 2002. It is part of the Maidenhead Windsor and Eton Flood Alleviation Scheme (MWEFAS) and is a man made, 11.6 kilometre stretch of naturalistic river and habitats. The scheme reduces the risk of flooding to approximately 3,000 properties in Maidenhead, Windsor, Eton and Cookham.

The Jubilee River diverts river water from the River Thames upstream of Maidenhead, running parallel and to the north of the river, and rejoins the Thames downstream of Windsor.

Under normal conditions, the Jubilee River provides a local recreational and wildlife amenity. In flood conditions, water is diverted from the Thames and into the Jubilee River. This reduces flood levels in the River Thames running through Maidenhead, Windsor, Eton and Cookham.

Along the length of the Jubilee River are several weirs that keep water at levels similar to those experienced in the River Thames. The scheme also incorporates flood embankments to the north of Maidenhead and the west and north of Cookham.

The Jubilee River reduces flood risk to properties by increasing the total flood capacity of the channels flowing through the area. While it does not protect communities downstream of the scheme, it operates so that flood levels downstream are not adversely affected.

A short video has been produced that explains how the Jubilee River works. View it on the Environment Agency River Thames Waterways Team Facebook page .

More information

  • Follow us on Twitter @EnvAgencySE
  • Sign up to Flood Alerts and Flood Warnings , call Floodline on 0345 988 1188 or download the free Flood Alert app
  • To see which warnings are in force, please visit our flood warning information service
  • Email [email protected]

Is this page useful?

  • Yes this page is useful
  • No this page is not useful

Help us improve GOV.UK

Don’t include personal or financial information like your National Insurance number or credit card details.

To help us improve GOV.UK, we’d like to know more about your visit today. Please fill in this survey (opens in a new tab) .

  • International
  • Education Jobs
  • Schools directory
  • Resources Education Jobs Schools directory News Search

AQA Geography GCSE Lesson - River Landscapes - River Tees Case Studies Booklet

AQA Geography GCSE Lesson - River Landscapes - River Tees Case Studies Booklet

Subject: Geography

Age range: 14-16

Resource type: Lesson (complete)

Easygeography

Last updated

13 August 2024

  • Share through email
  • Share through twitter
  • Share through linkedin
  • Share through facebook
  • Share through pinterest

jubilee river flood relief channel case study gcse

AQA Geography GCSE Lesson - Living with the physical environment - Physical landscapes in the UK - River Landscape - River Landform of the River Tees -Case study Booklet

This is a self study booklet and contained everything a student needs to complete this learning. It also have QR codes with links through to external resources making it perfect for homework.

Students will learn about the erosional and deposition landforms along the river Tees in County Durham in the North East of England

  • Where is the RIver Tees
  • High Force Water Fall and Gorge
  • Meanders, Levees near Darlington

This lesson includes

  • Embedded videos
  • Differentiation for different abilities
  • Worksheet and resources for printing

This lesson is suitable for Key Stage 4 AQA Geography GCSE geography students. The lesson is suitable for a single 50 minutes - 1 hour lesson.

Tes paid licence How can I reuse this?

Get this resource as part of a bundle and save up to 19%

A bundle is a package of resources grouped together to teach a particular topic, or a series of lessons, in one place.

AQA Geography GCSE Lesson Bundle - Physical Landscape in the UK - River Landscapes - All fourteen lessons

AQA Geography GCSE Lesson Bundle - Living with the physical environment - River Landscapes - All Fourteen lessons Students will learn: * UK relief and landscape * Water cycle / Hydrological cycle * Long profile of a river * Weathering * River erosion and transportation * V shaped valley * Waterfall and gorges * Meanders and Oxbow lakes * Levess and estuaries * Hydrological Graph * What causes a river to flood * Soft engineering * Hard engineering * River Tees case study (workbook) * Banbury Case study These Lessons include: * Starters * Embedded videos * Differentiation for different abilities * Worksheet and resources for printing This lesson is suitable for Key Stage 4 AQA GCSE geography students. These lessons are suitable for fifteen 50 minutes - 1 hour lesson.

Your rating is required to reflect your happiness.

It's good to leave some feedback.

Something went wrong, please try again later.

This resource hasn't been reviewed yet

To ensure quality for our reviews, only customers who have purchased this resource can review it

Report this resource to let us know if it violates our terms and conditions. Our customer service team will review your report and will be in touch.

Not quite what you were looking for? Search by keyword to find the right resource:

jubilee river flood relief channel case study gcse

Skip to content

Get Revising

Join get revising, already a member.

Ai Tutor Bot Advert

Flood Relief Channels - flood management strategies

  • Created by: ellllllllllaa
  • Created on: 19-05-19 13:26

What is this Strategy?         A new channel is constructed to divert water when discharge is high, avoiding towns or other high-value land and reducing their flood risk. (e.g. the Jubilee River is a flood relief channel for the River Thames).

  • Water and rivers

No comments have yet been made

Similar Geography resources:

water on the land 0.0 / 5

Rivers 0.0 / 5

River soft and hard engineering 0.0 / 5

Managing floods 0.0 / 5

Geography GCSE - Rivers and Flooding 4.0 / 5 based on 4 ratings

AQA GCSE Geography Water On Land Powerpoint 0.0 / 5

Geography- managing floods, hard engineering 0.0 / 5

Water on the Land 0.0 / 5

AQA GCSE Geography A - Water On The Land - Full Revision Notes 5.0 / 5 based on 1 rating Teacher recommended

jubilee river flood relief channel case study gcse

  • 0 Shopping Cart

Internet Geography

Hard Engineering River Management

Hard engineering management of rivers involves the construction of structures, built to control the flow of water and reduce flooding.

Hard engineering river management involves the construction of structures built to control water flow and reduce flooding.

Dams and reservoirs

A large wall is built across a river, usually in the upper stages. The land behind the dam is then flooded, forming a reservoir .

The dam at Cow Green Reservoir, River Tees.

The dam at Cow Green Reservoir, River Tees.

Reservoirs store a significant amount of water, which helps reduce the risk of flooding, particularly during heavy or prolonged rainfall. As water flows through the dam, it can be used to generate electricity. Storing water in reservoirs ensures a constant flow even during periods of dry weather.

Disadvantages

To create the reservoir, large areas of land need to be flooded. This can lead to people being displaced (having to move away). Dams are costly to create. Sediment , transported by the river from the upper stages, is deposited in the reservoir, reducing the river’s velocity. This means less sediment is deposited further down the course of the river, which could reduce soil fertility on the floodplain.

Straightening

Straightening involves changing the course of the river. This involves straightening the channel by cutting out meanders.

Channel Straightening

Channel Straightening

Straightening allows water to flow along the course of the river more quickly. This reduces the risk of flooding.

As water is travelling faster, there is an increase in the risk of flooding further downstream. In addition, as the water flows faster, the erosion rate will increase. Unless the river banks are reinforced, the natural flow of water will cause meanders to form again in the future.

Embankments

This involves building up the banks of the river. This could be by creating levees or building walls. The image below shows embankments at Cockermouth. They were created to reduce the risk of flooding.

Flood defences at Cockermouth

Flood defences at Cockermouth

The river channel can hold more water, which reduces the risk of flooding.

Embankments are expensive to install. Also, if the embankment fails, the surrounding area will be rapidly flooded.

Flood relief channels

Flood relief channels are artificial channels created to divert water around or from important locations if a river is at risk of flooding.

Jubilee River flood relief channel

Jubilee River flood relief channel

River discharge is reduced, which means the risk of flooding is decreased.

There will be an increased risk of flooding where the flood relief channel re-joins the river. If bankfull capacity is reached in the flood relief channel, it will flood the surrounding area.

Internet Geography Plus

Premium Resources

Please support internet geography.

If you've found the resources on this page useful please consider making a secure donation via PayPal to support the development of the site. The site is self-funded and your support is really appreciated.

Related Topics

Use the images below to explore related GeoTopics.

Share this:

  • Click to share on Twitter (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to email a link to a friend (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to print (Opens in new window)

If you've found the resources on this site useful please consider making a secure donation via PayPal to support the development of the site. The site is self-funded and your support is really appreciated.

Search Internet Geography

Internet Geography Newsletter

Latest Blog Entries

jubilee river flood relief channel case study gcse

Pin It on Pinterest

  • Click to share
  • Print Friendly

IMAGES

  1. Jubilee flood relief channel case study

    jubilee river flood relief channel case study gcse

  2. Jubilee River Flood Relief Channel

    jubilee river flood relief channel case study gcse

  3. Physical landscapes in the UK AQA

    jubilee river flood relief channel case study gcse

  4. Jubilee River Flood Relief Channel

    jubilee river flood relief channel case study gcse

  5. GCSE AQA GEOGRAPHY Case Study Summaries

    jubilee river flood relief channel case study gcse

  6. AQA GCSE Geography- Jubilee Flood Relief Channel Case Study

    jubilee river flood relief channel case study gcse

COMMENTS

  1. Jubilee River Flood Relief Channel

    The Jubilee River is a flood relief channel on the River Thames. It was constructed to reduce the risk of flooding in Windsor and Eton by diverting water from the River Thames. It was funded by the Environmental Agency and cost £330 million. It opened in 2002, and at 11.17 kilometres long, it is the UK's largest artificial channel and was ...

  2. GCSE Geography- Case study- The Jubilee River flood relief channel

    The Jubilee River flood relief that was created to divert water from the River Thames, so the Thames wouldn't overflow its banks. It is 11.7 km long, 50 m and cost £110 million to build. It was created to look and act like a natural river. What were the social issues?

  3. GCSE Geography- Case study- The Jubilee River flood relief channel

    GCSE Geography- Case study- The Jubilee River flood relief channel. Why was the scheme needed? Click the card to flip 👆. To protect areas like Windsor and Eton during a flood, which are very high value areas (old and historic with high cultural capacity and important for tourism) - Needed to protect M4, important for economic reasons.

  4. Jubilee flood relief channel case study

    Jubilee flood relief channel case study. Subject: Geography. Age range: 14-16. Resource type: Assessment and revision. File previews. docx, 133.99 KB. A comprehensive one page case study of the Jubilee flood relief channel. Perfect for any specification, but written specifically for the AQA GCSE 9-1 course. Tes paid licence How can I reuse this?

  5. Jubilee River

    Jubilee River. The Jubilee River is one of the most significant fluvial flood risk management schemes, in terms of scale and investment, in the UK. It incorporates a wide range of aspects including significant areas of wetland and marginal habitats, a national cycle route, bridleways, and a significant length of the Thames long distance footpath.

  6. How does the Jubilee Flood Relief Channel work?

    In this video you can find out about how flooding happens along the River Thames, with a focus on the Jubilee Flood Relief Channel. This includes how the Jub...

  7. GCSE Geography

    4. Jubilee River. What is the name of the longest man-made flood relief channel in the UK (on the River Thames near Maidenhead)? 1. London relief. 2. Jubilee River. 3. Maidenhead relief.

  8. Jubilee River Case Study

    Jubilee River Case Study - Free download as PDF File (.pdf), Text File (.txt) or read online for free. The document discusses the Jubilee River flood alleviation scheme in the UK. It was designed to reduce flooding along the River Thames near Maidenhead, Windsor, and Eton through the construction of a 12 km long relief channel. Unlike traditional concrete channels, the Jubilee River was ...

  9. River Flooding

    River floods are one of the most common natural hazards. The risk from river flooding around the world has increased over the past 50 years. Graph showing the increase in flood events over time. The increased flood risk is the result of human factors outlined in the sections on hydrography and human activity - they include. Deforestation.

  10. GCSE Geography- Case study- The Jubilee River flood relief channel

    - The Jubilee River flood relief was created to divert water from the River Thames - so the Thames wouldn't overflow its banks. It is 11.7 km long, 50 m wide and cost £110 million to build. - It was created to look and act like a natural river

  11. Jubilee River

    Issues - Environmental. 2014 flooding downstream - fields were damaged and habitats disturbed Concrete weirs are ugly and algae collected behind them. Show full summary. Take a look at our interactive learning Flashcards about Jubilee River - Case Study, or create your own Flashcards using our free cloud based Flashcard maker.

  12. Geography-Jubilee River Flood Relief Channel-GCSE Flashcards

    Study with Quizlet and memorize flashcards containing terms like to reduce the risk of flooding in Windsor and Eton by diverting the water away from the River Thames, 330 million and 2002, 11.17km and its the UK's largest artificial channel, designed to look like a natural river with meanders and shallow reed bed with five weirs along its course and more.

  13. AQA GCSE Geography- Case Study- Jubilee Flood Relief Channel

    Example of flood management scheme: Jubilee River to accompany the ThamesCouncil did pay compensation to Wraysbury (low value land), because it. Post a Question. Provide details on what you need help with along with a budget and time limit. ...

  14. AQA GCSE Geography- Jubilee Flood Relief Channel Case Study

    This resource is a revision poster consisting of the facts that you need to know for the AQA GCSE Geography Case Study on Jubilee Flood Relief Channel (Physical Geog. International; Resources; Education Jobs; ... AQA GCSE Geography- Jubilee Flood Relief Channel Case Study. Subject: Geography. Age range: 14-16. Resource type: Assessment and ...

  15. Jubilee River flood alleviation scheme

    The Jubilee River was built by the Environment Agency and opened in 2002. It is part of the Maidenhead Windsor and Eton Flood Alleviation Scheme (MWEFAS) and is a man made, 11.6 kilometre stretch ...

  16. Geography

    the Jubilee River Scheme is the most expensive flood-relief scheme in the UK. Yet the weirs were damaged by floods, repair for one section was £680000. as a projected course of £330 million, the EA ran out of money, so if further engineering is required to alleviate flooding downstream, local councils and businesses will have to make up a £ ...

  17. *AQA GCSE Geography

    *AQA GCSE Geography - Jubilee River Flood-Relief Channel* ... 1 / 14. Flashcards; Learn; Test; Match; Q-Chat; Created by. Lewis_Cunningham. Share. Share. Students also viewed. GCSE Geography- Case study- The Jubilee River flood relief channel. 5 terms. will_turner41 ... CEEG 290 Engineering Economics Exam 1. 58 terms. mam1096. Preview ...

  18. Physical landscapes in the UK AQA

    Physical landscapes in the UK AQA - Flood management case study - Jubilee river flood relief channel. Subject: Geography. Age range: 14-16. Resource type: Worksheet/Activity. Darran Girling. 3.33 7 reviews. Last updated. 18 September 2018. ... Flood management case study - Jubilee river flood relief channel; Tes paid licenceHow can I reuse this?

  19. AQA Geography GCSE Lesson

    AQA Geography GCSE Lesson Bundle - Physical Landscape in the UK - River Landscapes - All fourteen lessons. AQA Geography GCSE Lesson Bundle - Living with the physical environment - River Landscapes - All Fourteen lessons Students will learn: * UK relief and landscape * Water cycle / Hydrological cycle * Long profile of a river * Weathering * River erosion and transportation * V shaped valley ...

  20. Flood Relief Channels

    Study planner; Past papers ... avoiding towns or other high-value land and reducing their flood risk. (e.g. the Jubilee River is a flood relief channel for the River Thames). Geography; Water and rivers ... River soft and hard engineering. 0.0 / 5. Managing floods. 0.0 / 5. Geography GCSE - Rivers and Flooding. 4.0 / 5 based on 4 ratings. AQA ...

  21. Hard Engineering River Management

    Disadvantages. There will be an increased risk of flooding where the flood relief channel re-joins the river. If bankfull capacity is reached in the flood relief channel, it will flood the surrounding area. Hard engineering river management involves the construction of structures, built to control the flow of water and reduce flooding.